presentation
en The new plant was that of 3.5 % and increased the capacity of beds in Marrakech and carry more than 300,000 nights per year. It should be noted that, in October 2006 at the hotel, a seaside resort constructed in accordance with the international standards of 1500 m² has been opened with a heated pool and all facilities for the care and well-being. The surveillance was conducted by the concept of Hydro.
prestation