presentation
en This season, which began in October 2007 for a maximum of 1000 cubic meters per day provided (an average of 750 m³ / j). The objective of this initiative is to treat the water as a result of the production and bottling of soft drinks. In this way the water prior to being removed from the rear in the sewers of Marrakesh. This project will allow the plant to treat up to 1,000 m³ / j of industrial wastewater.
prestation